top of page

CONSTRUCTION / ENGINEERING

EXPLANATION TO COME

DJI_0360 14.jpg

ISTANBUL COMMODITY EXCHANGE

FACADE REMOVAL

PROJECT YEAR: 2021

PROJECT LOCATION: BAYRAMPAŞA / İSTANBUL

MAIN CONTRACTOR: BERBEROĞLU GROUP

PROJECTING: -

DESCRIPTION: CONTROLLED DISASSEMBLY OF FACADE ELEMENTS DAMAGED DUE TO ADVERSE WEATHER CONDITIONS AND DISPOSAL OF DEBUT.

20210317_161023.jpg

yavuz sultan selİm köprüsü

drainage well maintenance and repair

PROJECT YEAR: 2021

PROJECT LOCATION: SARIYER / ISTANBUL

MAIN CONTRACTOR: ICE OTOYOL İŞLETME

PROJECTING: -

DESCRIPTION: RENOVATION AND FIXATION OF CORROSIONED WATER DRAIN PIPES

AKBANK DATA CENTER

EARTHQUAKE ISOLATOR INSTALLATION

PROJECT YEAR: 2018

PROJECT LOCATION: KOCAELİ / ŞEKERPINAR

MAIN CONTRACTOR: TEK YAPI - ERİŞKON ENGINEERING

PROJECT: BERBEROĞLU GROUP

DESCRIPTION: INSTALLATION OF 220 EARTHQUAKE ISOLATORS APPLIED TO THE FOUNDATION OF THE NEWLY CONSTRUCTED DATA CENTER BUILDING WITH 2mm / 0.5mm SENSITIVITY.

YSS 1.jpg

YAVUZ SULTAN SELIM BRIDGE

INTERIOR DESK STAIRS AND PASSAGE BRIDGES

PROJE YILI : 2016

PROJE YERİ : SARIYER / İSTANBUL

ANA YÜKLENİCİ : İCA / HYUNDAI CONSTRUCTION

PROJELENDİRME : BERBEROĞLU GRUP

AÇIKLAMA : İKİ KITADA BULUNAN BETONARME TABLİYE İÇERİSİNDE VE TABLİYE TAŞIYICI AYAKLARDA MERDİVEN VE ULAŞIM KÖPRÜLERİNİN UYGULANMASI

8.jpg

ADEN RESTAURANT & CAFE

STEEL CONSTRUCTION

PROJE YILI : 2016

PROJE YERİ : ARNAVUTKÖY / İSTANBUL

ANA YÜKLENİCİ : BERBEROĞLU GRUP

PROJELENDİRME : BERBEROĞLU GRUP

AÇIKLAMA : BOĞAZKÖY MESİRE ALANI İÇERİSİNDE YER ALAN RESTAURANT BİNASININ PROJELENDİRİLMESİ VE KONSTRÜKSİYON İMALATININ YAPILMASI

DSC_1970.jpg

VIP LOUNGE

SUSPENDED CEILING AND VALVE CONSTRUCTION

PROJECT YEAR: 2010

PROJECT LOCATION: SIRTE / LIBYA

MAIN CONTRACTOR: SYSTEM CONSTRUCTION

PROJECT: BERBEROĞLU GROUP

DESCRIPTION: MANUFACTURING AND APPLICATION OF SUSPENDED CEILING AND ELLIPSE VALVE CONSTRUCTION OF VIP LOUNGE BUILDING LOCATED IN SIRTE, LIBYA

FSM.jpg

FATIH SULTAN MEHMET BRIDGE

MAINTENANCE AND REPAIR OF SUSPENSION ROPES

PROJECT YEAR: 2008

PROJECT LOCATION: ISTANBUL

MAIN CONTRACTOR: KGM

PROJECTING: -

DESCRIPTION: REPAIR OF SUSPENSION ROPES DAMAGED BY ADVERSE WEATHER CONDITIONS AND RENEWAL OF THE INSULATION ON THE CONNECTORS.

FIELDSS.jpg

FIELD'S MENTION

STEEL CONSTRUCTION

PROJECT YEAR: 2005

PROJECT LOCATION: BATON ROUGE / LA / USA

MAIN CONTRACTOR: DİLŞAT MERALER

PROJECT DESIGN: DİLŞAT MERALER

DESCRIPTION: MANUFACTURING AND ON-SITE IMPLEMENTATION OF STEEL CONSTRUCTION TURNING LADDER

BERBEROĞLU_GRUP_LOGO